In remote locations, industrial clients sometimes mistakenly tend to overlook interconnecting to utility grids because of the required higher initial investment.
This white paper presents a strategy to:
- Define high-level parameters for the power transmission system
- Evaluate equivalent energy costs for specific industrial sites in remote locations
- Determine whether a more detailed study is required
The results can also serve as a baseline scenario for designing a transmission line.