Study and optimal design of waste rock piles for an iron ore mine
IN THE WORDS OF OUR EXPERT…
“Our client now has a solid plan and detailed technical directives to minimize the risk of stockpile failures and comply with mining permit requirements. Overall costs were reduced through a rigorous constructability review, which focused on prioritizing the use of low cost construction methods wherever possible.”
Luciano Piciacchia, Director – Earth and Infrastructure Business Line