BBA performed a feasibility study for a new copper-gold deposit located at 260 km southwest of Lhassa, Tibet.

 

Based on mining methods, production rates and metallurgical yields, the study revealed that the Xietongmen open pit mine would have a life span of 13.5 years at a production rate of 40,000 tons per day. Additionally, the study forecasted an after-tax yield of 20%.

 

The BBA team undertook the following activities: 

  • Tibet site visit
  • Meetings with specialist staff in geology and mineralogy
  • Optimization and detailed conception of open pit mine
  • Strategic long term mining plan by phase
  • Yearly production plan
  • Conception and management of tailing ponds
  • Calculation of mine equipment requirements
  • Operating costs and technical assistance