BBA

Wind Power

Prince Project phases I & II
  • LOCATION
    Sault-Ste-Marie, Ontario, Canada
  • CLIENT
    Brookfield Power Wind
  • PERIOD
    2003-2008
  • DISCIPLINES
    Electrical

PROJECT DESCRIPTION                          

This project was carried out with Hatch Acres. BBA/Hatch Acres provided engineering, environmental planning and field services during the preliminary engineering and construction phases. In this project, BBA/Hatch Acres were Owner's Engineer for the construction of the 99 MW Prince I and 90 MW Prince II wind farms. The scope of work for BBA consisted of the following : 

  • Preliminary engineering
  • Preparation of the performance requirements, supplementary conditions, technical specifications and document list
  • Review of BOP design, detail engineering, drawings and equipment specifications
  • Field supervision for the electrical collector systems, substations, transmission and overhead lines, and the overall commissioning of the wind farm
  • Design review for a 34.5 kV collector system and wind turbine's grounding grid
  • Participation in value engineering/cost reduction process