This project was carried out with Hatch Acres. BBA/Hatch Acres provided engineering, environmental planning and field services during the preliminary engineering and construction phases. In this project, BBA/Hatch Acres were Owner's Engineer for the construction of the 99 MW Prince I and 90 MW Prince II wind farms. The scope of work for BBA consisted of the following :
- Preliminary engineering
- Preparation of the performance requirements, supplementary conditions, technical specifications and document list
- Review of BOP design, detail engineering, drawings and equipment specifications
- Field supervision for the electrical collector systems, substations, transmission and overhead lines, and the overall commissioning of the wind farm
- Design review for a 34.5 kV collector system and wind turbine's grounding grid
- Participation in value engineering/cost reduction process