From the beginning of the project until its completion, BBA was actively involved in the construction of the Varreux II plant located in Haiti. The plant includes a six (6) diesel generator sets with a total installed capacity of 24 MW. The amount of power produced by the plant provides enough electricity for one third of the Haitian capital. Throughout the project, BBA was responsible for the detailed engineering, plant automation, construction supervision, and commissioning. BBA's mandate included: