PROJECT DESCRIPTION
BBA analyzed various solutions for increasing cleaning system capacity on days when volume exceeds a predetermined volume due from variations in mine-run grade.
BBA also performed a techno-economic study, including:
- Added economic capacity required by the cleaning circuit
- Profits quantified in terms of the grade variability of copper intake
- Extrapolation of variability to future mine plans
- System configuration and possible locations pour installation
- Preliminary estimate for new equipment installation