  • LOCATION
    Toulnustouc power plant, Québec, Canada
  • CLIENT
    Hydro-Québec
  • PROJECT
    Detailed engineering, equipment specifications, procurement, installation and commissioning
  • PERIOD
    2003-2005
  • PROJECT VALUE
    35 M $
  • DISCIPLINES
    Electrical, mechanical, civil, instrumentation and control, architecture

PROJECT DESCRIPTION

In partnership with electrical and mechanical contractors, BBA was responsible for the engineering, procurement, installation and commissioning of all mechanical and electrical Balance of Plant services for the new Toulnustouc hydroelectric power plant, which included architectural design. BBA's mandate consisted of:

  • HVAC systems
  • Raw, filtered and potable water piping
  • Low/high pressure compressed air network
  • Oil transportation network