PROJECT DESCRIPTION
Design and development of a gold concentrator in the city of Malartic, at the pre-feasibility level. This study includes the following key elements:
- General arrangement of the crusher, concentrator, service building and garage for the mine trucks
- Flow sheet development, including test work planning, mass balance, equipment sizing and mine plan validation
- Infrastructure development, including the concentrator building, service building, mine garages, service and access roads, pump houses for fresh and potable water, water take- ups for fresh and potable water, and the waste water treatment plant
- Electrical arrangement, including a 121 kV-13.8 kV outdoor substation, power transformers and the mine's electrical system