Industrial Utilities
Modernization of the North boiler room of the Alcoa Aluminum smelter in Baie-Comeau
|
|
- LOCATION
Baie-Comeau, Québec, Canada
- CLIENT
Alcoa Première Fusion
- PROJECT
Re-engineering of the thermal power plant
- PERIOD
2006-2007
- DISCIPLINES
mechanical
|
PROJECT DESCRIPTION
- Installation of two new energy-efficient boilers (2 x 450 HP)
- Replacement of 3 existing Vapour boilers
- Installation of 3 new water supply pumps and a crane attachment to facilitate pump maintenance
- Optimization of the vapour distribution network
- Modernization of controls
- Reduction of energy costs by $470,000 annually
- Reduction of maintenance costs by $65,000